Insights

Research, analysis, and perspectives on the built world.

Industry

Hyperscale Data Center Lease Terms in 2026: What Developers Need to Know

Hyperscale and AI anchor leases in 2026 are being structured around power floors, take-or-pay commitments and tighter ramps. November announcements added two signals: an 18-year, 150 MW critical IT lease, and a hyperscaler paying about $200 million up front before a lease was signed. This post covers the commercial terms that matter and how to underwrite them.

June 16, 2026 ·8 min read

Technology

AI Power Risk Scoring for Data Center Sites: How Developers Are Quantifying the Primary Constraint

AI power risk scoring decomposes grid access into five risk dimensions -- power availability, grid reliability, interconnection queue risk, price/regulatory risk, and community/policy risk -- each requiring different data and model types. This post explains how developers use these scores in site selection, IC underwriting, and lease negotiation.

June 16, 2026 ·7 min read

Industry

Data Center Ratepayer Protection Laws Are Reshaping Site Selection in 2026

Oklahoma, Virginia, and North Carolina passed or advanced ratepayer protection legislation in June 2026 requiring data center developers to fund their own grid upgrades. This post explains what the laws require, the cost implications for project underwriting, which markets are most exposed, and what belongs in pre-LOI diligence now.

June 15, 2026 ·5 min read

Workflows

The Data Center Utility Timeline Gap: How AI Helps Developers Stop Underestimating It

Bloom Energy's 2026 Power Report documents a 1.5-2 year utility delivery gap that is widening in Northern Virginia, the Bay Area, and Atlanta. This post explains where the gap comes from, how AI helps development teams model and monitor it, and where human judgment still governs the critical decisions.

June 15, 2026 ·5 min read

Asset Classes

AI Factory Data Centers: What the New Development Format Actually Requires

AI factories -- exemplified by Nvidia's DSX architecture and hyperscaler GPU clusters -- operate at 50-100 kW per rack and cost up to $25M per MW to build. This post explains how the format differs from standard hyperscale development across site criteria, design, underwriting, and where AI tools apply across the development workflow.

June 15, 2026 ·5 min read

Asset Classes

Immersion Cooling for Data Centers: What Developers Need to Know Before They Commit

Immersion cooling moves heat from chips to fluid rather than air, enabling power densities that conventional air cooling cannot reach. This guide explains single-phase versus two-phase systems, infrastructure implications for developers, vendor options in 2026, and the limitations that need to be modeled before committing to immersion in a new build.

June 13, 2026 ·5 min read

Technology

BIM in Data Center Construction: How Developers Get Value From the Model

BIM is the coordination backbone for data center construction, enabling clash detection, MEP coordination, and prefabrication support in projects where system density makes conflicts expensive. This guide covers the core BIM use cases, where AI adds value in 2026, practical limitations, and how developers should define BIM requirements before project kickoff.

June 13, 2026 ·5 min read

Workflows

Data Center O&M Handoff: How Developers Avoid Leaving Problems for the Operator

O&M handoff transfers custody, documentation, warranties, and maintenance data from developer to operator. Poor handoffs leave operators reconstructing asset registers and missing warranty claims for months. This guide covers the five key documentation packages, where AI helps compile and verify handoff data, and the contract obligations developers should include to enforce handoff quality.

June 13, 2026 ·5 min read

Industry

Data Center Moratoriums in 2026: What the Policy Shift Means for Developers

As of June 2026, 14 US states have considered or implemented data center construction restrictions, and cities are now extending local pauses too. San Francisco signed an extension to September 2027 on 23 November 2026, after a city report found transmission near capacity. This piece explains the forces behind the wave and why regulatory risk belongs in the first pass of site selection.

June 12, 2026 ·6 min read