Insights

Research, analysis, and perspectives on the built world.

Technology

AI Inference Data Centers: How Inference Workloads Change Development Requirements

This post explains how AI inference workloads change data center development requirements. It covers rack density, liquid cooling, latency, networking, redundancy, power phasing and the practical role of AI in planning inference-ready facilities.

May 13, 2026 ·5 min read

Workflows

Data Center Permitting Workflow AI: How Developers Track Approvals Before They Slip

Data center permitting has become a live execution risk, not a back-office checklist. This post breaks down how AI can track approvals, local conditions, public hearing risk and escalation triggers without replacing legal or entitlement judgment.

May 12, 2026 ·5 min read

Industry

Data Center Construction Labor Shortage 2026: Why Skilled Trades Are Now a Site Selection Constraint

The data center construction labor shortage is becoming a development constraint as AI campuses scale from tens of megawatts to hundreds. This post explains why electricians, mechanical contractors and commissioning specialists now affect market selection, schedule risk and underwriting.

May 12, 2026 ·5 min read

Technology

Digital Twins for Data Center Development: What They Can Model Before Construction Starts

Digital twins for data center development create a live model of power, cooling, layout and operational constraints before construction starts. This post explains what teams can model today, where the technology is still early and how AI makes digital twins more useful for development decisions.

May 12, 2026 ·5 min read

Industry

PJM Load Growth: What Data Center Developers Need to Underwrite

PJM's 2026 load forecast makes power availability a front-end underwriting question for data center developers. The post explains what changed, which metrics matter and how developers should price grid risk before site control.

May 11, 2026 ·5 min read

Workflows

Data Center Grid Capacity Screening: A Developer's Workflow

Grid capacity screening is now one of the first filters in data center site selection. This workflow explains how developers should combine load forecasts, utility evidence, interconnection risk and human judgment before committing to a site.

May 11, 2026 ·4 min read

Asset Classes

Battery Storage for Data Centers: What Developers Need to Know

Battery storage is becoming part of the data center development stack as power demand, interconnection delays and reliability concerns rise. This post explains where BESS helps, where it does not and how developers should underwrite it.

May 11, 2026 ·5 min read

Workflows

Data Center Commissioning Checklist: What Developers Need to Verify Before Turnover

A practical data center commissioning checklist for developers moving from construction completion to operational turnover. Covers OPR, Basis of Design, factory testing, integrated systems testing, AI-assisted tracking and final handover risk.

May 10, 2026 ·5 min read

Asset Classes

Data Center Cooling Systems and Technology: A Developer's Guide to AI Density, Water and Heat

Data center cooling systems remove heat from IT and electrical equipment so a facility runs within safe limits. The main approaches are air cooling, containment, rear-door heat exchangers, direct-to-chip liquid cooling, immersion and evaporative or hybrid heat rejection. For AI workloads the cooling choice shapes site selection, water strategy, power, procurement and phasing, so it belongs before site control, not after design.

May 10, 2026 ·5 min read