Short answer: A developer owns the what and why of a project: land, power, entitlement, financing and risk. A construction firm owns the how: design-build, procurement and crews. An AEC firm brings architecture, engineering and construction expertise, usually for a fee. An AI-native development firm does all of this in one team on one system, so quality and speed do not get lost in handoffs between firms. This is how Build works as a vertically integrated, AI-native AEC firm for power-constrained infrastructure, data centers first. On the public numbers, building is large volume at thin margins, while owning the outcome is where returns concentrate, with more volatility. See our AI native development page for the full definition.
What is the difference between these firm types?
The industry uses these labels loosely, and the lines are blurring. The simplest way to separate them is by what each one owns and how each one earns.
What is a developer?
A developer owns the what and why of a project. It secures the land, the power and the entitlements, arranges the financing, and carries the risk. It earns on the value and upside of the finished asset. Hines, Related, QTS and Vantage are well-known examples of firms that develop real estate and data center assets.
What is a construction firm?
A construction firm, including a vertically integrated contractor, owns the how. It handles design-build delivery, procurement and the crews on site. It is typically paid to build someone else's brief, at a build margin. Bechtel and the large design-build general contractors are typical examples.
What is an AEC firm?
AEC stands for architecture, engineering and construction. An AEC firm brings that combined expertise to a project and is typically paid a fee for its services. Arup, AECOM and Jacobs are well-known examples.
What is an AI-native development firm?
An AI-native development firm is a firm where AI runs the repeatable research, analysis and iteration across the whole project, and named experts verify the output. Transactions, project management, design, engineering and delivery sit in one team on one system. Build is built this way: the value is the people, enabled by technology.
How do they compare?
| Developer | Construction firm | AEC firm | AI-native development firm | |
|---|---|---|---|---|
| Owns | The what and why: land, power, entitlement, financing | The how: design-build, procurement, crews | Architecture, engineering and construction expertise | The full path from site to delivery |
| Paid how | Value and upside of the asset | Build margin on someone else's brief | Fees for services | Outcome-led, one accountable team |
| Risk | Carries the asset and market risk | Carries construction cost and schedule risk | Carries professional and design risk | Reduced by validating before committing |
| Speed | Depends on the partners it hires | Fast once the brief is fixed | Depends on handoffs to builders and owners | Fast because there are no handoffs between firms |
| Best for | Owners who want to hold the asset | A defined brief that needs building | Specialist design or engineering input | Power-constrained projects where speed and quality both matter |
| Typical revenue scale (public examples, latest fiscal year) | Residential developers are the large public examples: D.R. Horton $34.3bn (FY Sep 2025), Lennar $34.2bn (FY Nov 2025), Poly Developments RMB 308.1bn (2025). Hines, Related, QTS and Vantage are private and do not disclose | Skanska SEK 179.3bn (2025, construction and development combined). Turner and Bechtel rank first and second on the ENR 2026 Top 400 list; ENR's revenue figures are paywalled and not quoted here | AECOM $16.14bn (FY Sep 2025), Jacobs $12.03bn (FY Sep 2025), WSP C$18.3bn (2025), Arup £2.16bn (FY Mar 2025) | Not shown |
| Typical margin (as reported, measures differ) | D.R. Horton 13.8% pre-tax margin. Lennar 9.3% net margin on a 17.7% gross margin on home sales. Poly about 3.2% pre-tax (our calculation from the filing). Lendlease development return on invested capital 17.0% in FY25, up from 7.3% (a return measure, not a margin) | Skanska construction operating margin 4.1% for 2025. Lendlease construction EBITDA margin 1.1% for FY25, and 4.0% in the second half | AECOM 16.5% segment adjusted operating margin (on net service revenue). WSP 18.3% adjusted EBITDA margin (on net revenues). Arup 2.7% operating profit. Jacobs about 7.2% GAAP operating profit on gross revenue (our calculation) | Not shown |
Revenue figures are in each company's own currency and are not converted. Margins use different measures and bases, so compare the pattern within a row, not the numbers across rows. Figures are the latest fiscal year available as of 20 November 2026.
What do the revenue and margin numbers tell us?
Three patterns show up in the public filings.
Building is volume at thin margins. Skanska reported a 4.1% operating margin in construction on SEK 179.3bn of group revenue in 2025. Lendlease's FY25 results show construction at a 1.1% EBITDA margin for the full year and 4.0% in the second half, against a stated target of 3% to 4%.
Owning the outcome pays more, with more variance. In the same Lendlease results, development earned a 17.0% return on invested capital in FY25 (7.3% the year before), and investment management earned a 40.6% EBITDA margin. ROIC and EBITDA margin are different measures. ROIC is profit after tax over the capital tied up in projects, while EBITDA margin is operating earnings over revenue, so the two should not be compared as like for like. The direction still holds: the firms that carry the land, power and financing risk are the ones that earn on the upside. The downside is real too. Skanska's project development income was SEK 0.7bn in 2025 including asset impairment charges of SEK 0.8bn, down from SEK 1.2bn, and Poly Developments' 2025 pre-tax profit was about 3.2% of revenue.
Design and engineering sits in between and varies widely by measure. Reported margins range from 2.7% at Arup to 16.5% at AECOM, depending on the firm and on how margin is defined. Fee-based expertise is steadier than development and richer than pure building, but the owner of the project still keeps the upside.
What this means for an owner: the party that holds the outcome risk is paid for it. A project run by separate firms splits that outcome across a developer, a designer and a builder, each optimizing its own margin. An AI-native development firm is accountable for the outcome as one team, which is why Build leads with the result and the people delivering it.
Where do the hybrids fit?
The lines between these categories have been moving for decades. Several firms that began as builders added development. Lendlease describes starting as a construction business in the 1950s and now operates Investments, Development and Construction segments. Mortenson was founded in 1954 as a construction company and started a national development group in 1975. Ryan Companies began as a lumber and coal business, and now offers construction, architecture, engineering, real estate development and capital markets services. Gilbane is the parent of both a building company and a development company. Skanska also combines construction and project development.
The move runs the other way too. Compass Datacenters is a developer-first example: it develops and operates its own campuses and uses a standardized, prefabricated design and a controlled construction process to deliver at speed. Compass does not disclose revenue. The pattern is the same in every direction. Firms combine capabilities because handoffs cost time.
When should you hire which?
Hire a developer when you want a partner to take the land, power and entitlement risk and you want to share in, or hold, the asset.
Hire a construction firm when the site, power and design are settled and you need a team to build to a fixed brief on schedule.
Hire an AEC firm when you need specialist architecture or engineering depth, such as a design basis, a utility study or a technical review.
Hire an AI-native development firm when power is the constraint and the sequence matters. Data center projects are decided by power and permits, which take longest, so the work has to start with the site and validate it before any design is committed.
For most power-constrained projects, the expensive failures happen at the seams: a site chosen before power was confirmed, a design drawn before the permit path was known, a contractor briefed on assumptions nobody checked. The more of that sequence one accountable team runs, the fewer seams there are.
What does an AI-native development firm change?
One system, no handoffs. Transactions, project management, design, engineering and delivery run in one team on one system. What the site team learns about power reaches the design team immediately, instead of arriving weeks later in a report from another firm.
Sites, then validate, then bundled services. The work starts with AI site selection, where AI screens large areas against power, zoning, fiber, water and hazards. Every shortlisted site is then validated against primary sources, with experts confirming the findings that decide the deal. Only then do bundled services such as AI design, engineering, planning and permitting begin. You can see how this starts in our site selection service.
Software does the iteration, people make the decisions. Design and analysis go through many iterations. In a traditional firm, people do that iteration by hand. Here, software does it and experts verify the result, which is where the quality and speed come from. The closest model for the integrated approach is Arup's total design philosophy: Sir Ove Arup wrote that all relevant design decisions should be considered together and integrated into a whole by a well organised team. The same idea applies across the full project, with AI doing the repetitive work.
Development only, with outcomes first. Build is the execution engine for infrastructure and data centers. The measure is the outcome for the owner: a validated site, a design that matches the power available, and a delivery path that holds.
What should you ask any firm before you hire?
Who is accountable if the power date moves?
Which steps happen in one team and which are handed to another firm?
When is power validated: before design, or after?
Who verifies the analysis, and can you speak to them?
How does the firm get paid, and does that match your goals?
For the process behind these answers, see AI native development.