Short answer: Load bank testing runs a generator against a resistive electrical load so you can prove it carries real demand, without depending on the building. Under NFPA 110, diesel generators are exercised monthly for at least 30 minutes at no less than 30% of standby nameplate kW, or at the manufacturer's minimum exhaust gas temperature. If a site cannot reach that on its real load, an annual supplemental test applies. Load banks matter early in a data center, because commissioning happens before IT load exists. Build treats this as part of power analysis for data centers: sizing and testing should be planned with the site, not after it.
What is a load bank test?
A load bank is a device that converts generator output into heat, creating a controlled electrical load. It lets operators exercise a generator at a chosen percentage of its rating. In a new data center there is often little or no IT load yet, so a load bank is how teams show the generator, cooling and controls work under load.
What does NFPA 110 require?
According to NFPA 110 as excerpted by Cummins, generator sets are exercised at least monthly for a minimum of 30 minutes, either with loading that maintains the manufacturer's minimum exhaust gas temperature, or under operating temperature conditions at not less than 30% of the standby nameplate kW rating. A supplemental load bank is permitted to be used to meet the 30% figure. OnPoint Generators summarizes the structure:
| Test | Frequency | Load | Duration |
|---|---|---|---|
| Monthly exercise | Monthly | At least 30% of nameplate kW, or manufacturer's minimum exhaust temperature | 30 continuous minutes |
| Annual supplemental test | Annually, if the monthly test does not meet the threshold | 50%, then 75% of nameplate kW (2025 edition) | 30 minutes, then 1 hour |
| Triennial test | Every 36 months, Level 1 systems | At least 30% of nameplate kW for diesel | Class duration or 4 hours, whichever is less |
Edition matters. OnPoint and MGIE report the 2025 edition removed the 25% first step that earlier editions required, cutting the annual test from two hours to 1.5. Confirm which edition your local authority enforces.
How big a load bank do you need?
Build arithmetic, illustrative only, not a design rule: take a 2,000 kW generator. The monthly 30% threshold is 600 kW. For the 2025 annual test, 50% is 1,000 kW for 30 minutes and 75% is 1,500 kW for one hour. If a building load supplies part of that, the load bank covers the difference. If it cannot, the load bank needs to cover the whole step. Always size with the electrical engineer and the manufacturer.
How does this connect to sizing and fuel?
Testing burns fuel and stresses the same equipment sized in the design. Load bank runs at 75% for an hour draw on the same tanks covered in our fuel storage guide, and the choice of generator rating, covered in generator sizing for AI data centers, sets the test loads. Plan fuel for testing as well as emergency runtime.
What should developers plan for?
Decide on a permanent or rented load bank early. Cummins' excerpt recommends specifying a permanent load bank to allow proper loading during testing.
Match the test plan to the code edition your authority enforces.
Include test fuel and air permit limits. Air permits may cap runtime hours.
Tie testing to commissioning. Acceptance happens before IT load.
Build is the development execution engine for infrastructure, built for quality and speed. We source and validate sites, then bundle engineering and the services that follow. See AI site selection and Build's site selection services.
Key takeaways
A load bank test proves a generator can carry load without relying on the building.
NFPA 110 sets monthly exercise at 30% of nameplate (or minimum exhaust temperature) and an annual supplemental test if that is not met.
The 2025 edition dropped the 25% step. Check the edition your authority uses.