Hotel & Hospitality
.

Hospitality Assets, Faster.

Build benchmarks RevPAR, sizes the market, and models development cost for hospitality assets in days rather than months.

Contact sales
Axonometric stack of a site from raw land to a live data center

01

Site Selection and Due Diligence

Know what you're buying before you commit capital.

  • Inbound triaging
  • Site sourcing and buy-box analysis
  • Site screening
  • Desktop due diligence
Partner with Build

02

Power and Grid

Validate power before it becomes the reason a deal falls through.

  • Substation proximity and capacity
  • Interconnection queue analysis
  • Utility readiness assessment
Partner with Build

03

Design and Feasibility

Translate site constraints into a clear picture of what can be built and at what capacity.

  • Block fits and test fits
  • Buildable acreage analysis
  • Political and community sentiment
Partner with Build

04

Site Development

Full technical validation before capital is committed.

  • Geotechnical and environmental screening
  • Planning and permitting outlook
  • Fibre availability and routing
Partner with Build

05

Data and Project Management

Every project, site, and data source in one place.

  • Live project tracking and site monitoring
  • Agentic VDR and document intelligence
  • Atlas GIS with 14,200+ live data sources
Partner with Build

06

Custom Deployments

Build embeds directly with your team to automate the work that slows you down.

  • Data acquisition and visualisation
  • Bespoke workflow development
  • Embedded AI for internal teams
Partner with Build

With Build.

Source sites on real demand drivers

Rank locations by demand generators, comp-set RevPAR and air and road access – the fundamentals of a working asset.

Turn market and STR data into signal

Comp-set performance, pipeline and demand records structured into one queryable view.

Underwrite RevPAR the IC can trace

ADR, occupancy and ramp assumptions grounded in sourced data, not a single feasibility study.

  • Comp-set RevPAR, pipeline and demand generators pulled per market automatically – no single commissioned study holding up the whole screen.
  • Air and road access and demand seasonality scored at screen stage, so weak markets drop early instead of after a paid feasibility pass.
  • ADR and occupancy inputs refreshed continuously, so the ramp case holds up at IC rather than cracking on a second read.

A consultant for every question

Each question a separate scope, a separate fee, and a six-week wait.

Disconnected workflows

Siting, permitting, policy, and compliance each in their own system. A change in one is rework in all the others.

Fragmented, unreliable data

Every layer from a different source, at a different date, reconciled by hand.

Services

Decide before your competitors do.

Build platform – portfolio view

Build compresses the pre-development lifecycle. Site selection, due diligence, power assessment, feasibility – running in parallel, delivered in days. The world's largest institutions trust Build to move faster and make better decisions on their most important projects. Decision velocity.

Contact sales
  • Run sourcing to design in a week, rather than months.
  • Analysts validate recommendations instead of gathering data. Ten deals a week instead of one.
  • Every site scored and cited. Leadership decides in minutes, not months.

Trusted Across Geographies.

Trusted by Institutions.

Iron Mountain Data Centers
"Build Inc. is supporting Iron Mountain Data Centers to fail fast on unsuitable opportunities as IMDC expands at an incredible rate to serve customers in critical locations for high-demand workloads. For every site IMDC develops and serves, site screening and due diligence are performed on a vast number of opportunities, with Build Inc. helping get IMDC closer to the most meaningful and suitable sites for their customers."
Jamie Allen

Jamie Allen

Head of Site Selection, Iron Mountain Data Centers

STACK Infrastructure
"For a long time I’ve worked on hyperscale projects, including at AWS. With Build, we can make quality decisions, faster. Build helps us find the fatal flaws in our pipeline, and helps us find and move faster on the sites that can work. I’m happy we’ve partnered with Build since the early days."
Mark Gethings

Mark Gethings

Senior Manager, Site Selection & Development Due Diligence, STACK Infrastructure

UK Government
"Build has made an important contribution to the UK's ability to identify and assess sites for AI infrastructure."
Scott Campbell

Scott Campbell

Senior Policy Advisor AI, DSIT (UK Government)

Tishman Speyer
"Build.inc is a valued partner. By delivering time-intensive research, they’ve enabled our team to evaluate a greater volume of opportunities across markets efficiently while maintaining a high level of rigor."
Michael Alderman

Michael Alderman

Managing Director, Head of US Industrial, Tishman Speyer

Case Studies.

Build sourcing workflow

01

Tier-One Data Centre Developer

A tier-one developer spent three to four months qualifying candidate sites in each target market, working from broker lists that surfaced only what was already listed, and never at parcel level.

Build scanned the entire search ring instead, assessing 47 parcels across 2,400 sq km and ranking the top eight against the buy box on power, planning, and environmental grounds. The scan came back in four days, with no broker fees.

2,400

sq km search ring covered

47

parcels assessed

4 days

to a full market scan, from 3-4 months

0

broker fees

02

Global Hyperscaler

A global hyperscaler ran desktop diligence through external consultants at six to eight weeks per site, with power, environmental, title, and zoning each handled by a different firm for $80-120k a site.

Build now returns the full desktop DD in two days: power availability, interconnection queue, zoning, flood, geotechnical, fiber, and community sentiment in one cited report, at a fraction of the consultant cost.

2 days

for full desktop DD, from 6-8 weeks

7

risk categories covered in one pass

85%

cost reduction vs external consultants

03

Institutional Developer

An institutional developer reviewed its pipeline quarterly, three analysts working sites one at a time, forty to fifty opportunities a year, scored differently in every market.

Build screened 300+ sites across six markets in a single cycle, applying one Infrastructure Readiness Score to all of them. The same three analysts now cover ten times the pipeline without additional headcount.

300+

sites screened in one cycle

6

markets covered

10x

throughput, same headcount

1

consistent scoring framework

04

Government

A national government was selecting sites from developer submissions and broker proposals, with no systematic view of its own land base, decisions shaped by what was volunteered rather than what existed.

Build assessed every parcel in the country against power infrastructure, planning designation, grid capacity, and development feasibility, then ranked and mapped twelve AI Growth Zones. It took weeks, against the twelve-month study the conventional route would have needed.

National

land base assessed in full

12

AI Growth Zones identified and ranked

Weeks

not the 12-month conventional study

Frequently Asked Questions:

Site screens same day. Desktop due diligence in 2-3 business days. Site sourcing in 3-4 business days. Turnaround depends on project type and geography. If you have an urgent requirement, tell us and we will prioritise accordingly.

Digital infrastructure, energy, industrial, and institutional real estate. Data centres are our primary specialism. We cover all major geographies across North America, Europe, and APAC.

Proprietary datasets purchased directly from providers, including power and grid data, fiber infrastructure, and planning records. We also build and maintain our own geospatial database, Atlas, across 18+ countries. Every claim in a Build output is cited to its source.

Two layers. Automated checks run before any output reaches a reviewer: every claim is traced to an authoritative source and confidence-scored. Then Build's in-house domain experts review and validate the output before it is delivered. Nothing unverified ships.

Send us site coordinates, a redline, and any context you have. We handle the rest. For site sourcing, send us a search ring and your buy-box criteria.

Yes. Build operates under strict data confidentiality terms. Your site data, deal information, and client inputs are never shared with third parties or used outside your engagement. We are SOC 2 Type II certified.

Explore a partnership with us or email info@build.inc. We can typically run a proof-of-concept on a live site within days of first contact.

What markets does Build cover?

Build provides site selection, due diligence, and underwriting services across data centers, industrial and logistics, energy and power, office, telecommunications, multifamily, hotel, and residential asset classes worldwide.

How does Build source sites for institutional clients?

Build's team, working on our own technology stack, systematically reviews every on-market and off-market opportunity across target geographies – scoring each against the client's buy box before surfacing results. This covers geospatial, planning, utility, environmental, and financial dimensions simultaneously.

What data sources does Build use for market analysis?

Build ingests over 1,600 live data sources including geospatial and mapping data, municipal and government portals, national databases, utility records, proprietary datasets, real-time web and news feeds, earnings call transcripts, and client firm data.

Where does Build operate?

Build serves clients across 43 countries, with core coverage across North America, the United Kingdom, and Western Europe. Build supports cross-border investment mandates for institutional investors, developers, and operators.

Kick off a project
© 2026 Build Technologies, Inc. SOC 2 Type II Certified