All terms

Data Center Technical Due Diligence

Data center technical due diligence is the engineering review of an existing or planned data center before an acquisition, financing or lease. It tests whether the power, cooling, mechanical and electrical systems, building and site can deliver the capacity and resilience the deal assumes, and what it will cost to close the gaps.

Updated

What technical due diligence covers

A data center technical due diligence covers: utility supply and substation capacity, with the timeline for any additional load; electrical distribution, UPS, generators and redundancy; cooling plant, water supply and efficiency; the building fabric, structure, floor loading, fire protection and security; operating records, maintenance history and incidents; and permits, environmental conditions and planning constraints on the site. The output is a list of risks, remaining asset life and the capital needed to fix what falls short.

Technical, commercial and site due diligence

Technical due diligence asks whether the facility works and what it will cost to keep running. Commercial due diligence asks whether the tenants, contracts and market support the price. Site due diligence asks whether the land itself carries risk: power and infrastructure context, flood and environmental constraints, zoning and planning, access and land assembly. A buyer needs all three before committing capital.

Where Build fits

Build covers the site side of a data center deal. Site Screening checks a site against fourteen objectives, from grid and fibre to flood and land assembly. Desktop Due Diligence goes deep on a single site before you commit capital. Every finding carries its source, so the engineering and commercial teams can check the evidence.

Frequently Asked Questions:

What does technical due diligence cover for a data center acquisition?

Power supply and substation capacity, electrical distribution and redundancy, cooling and water, the building and its fire and security systems, operating and maintenance records, and the permits, environmental conditions and planning constraints on the site. It ends with the risks found and the capital needed to fix them.

How is technical due diligence different from desktop due diligence?

Technical due diligence inspects the facility's engineering systems. Desktop due diligence is an off-site investigation of the site itself, from public records, geospatial data and the documents in hand, used to find site risks before money is spent on surveys and inspections.

Does Build do data center technical due diligence?

Build covers the site-level evidence a data center acquisition needs: Site Screening against fourteen objectives and Desktop Due Diligence on a single site, each delivered with its sources. Facility engineering inspections remain with your technical advisers.