All terms

Buildable Area Analysis

Buildable area analysis is the process of working out how much of a development site can actually be built on. It starts from the gross parcel area and subtracts setbacks, easements, wetlands, floodplain, steep slopes and required buffers, leaving the net developable area that a building, campus or plant has to fit inside.

Updated

Gross area versus net developable area

A parcel listing gives gross acreage, which rarely reflects wetlands, easements or floodplain. Net developable acreage is the part of the parcel left after those constraints are removed, and it is the number that decides whether a design fits. On a data center campus the substation, generator and cooling yards, stormwater ponds, roads and setbacks all need room outside the building, so a site can look large enough on gross acreage and still be too small.

How to calculate the buildable area of a development site

To calculate buildable area: draw the site boundary and record its gross area; map the zoning setbacks and any required buffers from property lines, roads and neighbouring uses; remove recorded easements and rights of way, such as transmission, pipeline and access easements; remove wetlands, floodplain and other protected environmental areas; remove slopes too steep to build on economically; check what is left against the zoning code's coverage and height limits; and compare the net developable area with what the design needs, keeping a margin for layout changes found during design.

Where Build fits

Build's Buildable Area workflow works out net developable acreage for a site using the constraints found by Site Screening, which checks fourteen objectives in seven groups, from power and planning to environmental sensitivity, natural hazards and land ownership. Every constraint carries the layer or document it came from, so the team can see why each part of the site was excluded before it commits to a design.

Frequently Asked Questions:

How do you calculate the buildable area of a development site?

Start from the gross site area, then subtract zoning setbacks and buffers, easements and rights of way, wetlands, floodplain and other protected areas, and slopes too steep to build on. Check what remains against the zoning code's coverage and height limits, and compare it with the area the design needs.

What is the difference between gross acreage and net developable acreage?

Gross acreage is the whole parcel. Net developable acreage is the part you can build on after removing setbacks, easements, wetlands, floodplain, steep slopes and required buffers. Designs and land prices should be tested against net acreage, not gross.

Does Build run buildable area analysis?

Yes. Build's Buildable Area workflow works out net developable acreage on a screened site, using Site Screening's findings as constraints, with each constraint cited to its source.