# Office Development

Office development is the process of taking a site or an existing building to a ready-to-build new office project or a repositioning. Tenant demand, leasing velocity, supply of sublease space, the cost of tenant improvements and zoning decide whether the project works, and for existing buildings the question is often what the structure allows.

Updated 2026-11-26

## Overview

Office projects depend on tenants, and tenant demand is local and uneven. Some locations and building types lease well while others carry vacancy, so the first question is who the tenant is and what they will pay. A second question is physical: a new building needs a site that tenants want, and a repositioning needs an existing building that can be changed at a cost the rents support.

Build is a vertically integrated development firm with our own technology stack, taking projects from site to shovel-ready. For office, Build tests market demand first, then the site or building, so the project is only advanced where tenants and the real estate line up.

## What drives viability for an office project

1.  **Tenant demand.** Leasing velocity, the tenants in the market and the supply of sublease space.

2.  **Location.** Transit, amenities and the preferences of the target tenants.

3.  **Cost.** Land or acquisition basis, construction cost, tenant improvement and leasing costs against achievable rents.

4.  **Building and zoning.** Floor plate fit, building systems, parking and the approvals needed for a new use or a change of use.

## What gates an office project at each stage

| Stage | What decides viability |
| --- | --- |
| Market Analysis | Tenant demand, leasing velocity, sublease supply and the location preferences of target tenants |
| Site Selection | Transit and amenity access, floor plate fit, parking, and for existing buildings the physical fit |
| Acquisition and Financing | Basis against achievable rents, tenant improvement and leasing costs, and lender appetite for the product |
| Design | Floor plate efficiency, building systems, amenity space and, for conversions, how the existing structure limits layout |
| Permitting and Planning | Zoning for office use or a change of use, density, parking and design review |
| Engineering | Structural, mechanical and electrical systems and, for repositioning, the capacity of existing systems |
| Pre-Construction | Cost, phasing around tenants in place and long-lead building systems |
| Legal and Compliance | Lease obligations, title and easements, building code and accessibility compliance and entitlement conditions |
| Asset Management | Leasing, tenant retention, building operations and capital planning |

## Office sub-types

Class A towers compete on location, amenities and building quality. Suburban office competes on access and parking. Life science and research space adds specialized laboratory systems. Mixed-use buildings combine office with other uses and add entitlement complexity. Repositioning and conversion projects start from an existing building and test what it can become.

## Main risks

-   Demand that is weaker in the target location than the pro forma assumes.

-   Tenant improvement and leasing costs that grow faster than rents.

-   A building that cannot be changed at a workable cost.

-   Zoning or approvals that do not permit the intended use.

## How Build handles office development

Build analyzes market demand, screens sites or buildings, assesses repositioning feasibility, runs desktop due diligence and prepares the investment committee memo from sourced inputs. Our own technology stack structures leasing and market records, and Build's experts review the work. Build is a development firm doing the work, and your team receives finished deliverables.

Related reading: [CRE market research](https://build.inc/learn/cre-market-research), [test fit analysis](https://build.inc/learn/test-fit-analysis) and [investment committee memo](https://build.inc/learn/investment-committee-memo). See also Build's [Office market page](https://build.inc/markets/office).

## Frequently Asked Questions:

What is office development?

Office development is the process of taking a site or an existing building to a ready-to-build new office project or a repositioning. Tenant demand, cost, building fit and zoning decide whether the project works.

What makes an office project feasible?

A project is feasible when there is real tenant demand at a rent that covers land or acquisition basis, construction, tenant improvement and leasing costs, and when the site or building and its zoning support the intended use.

How is office repositioning different from new development?

Repositioning starts from an existing building, so the first test is what the structure and systems allow and at what cost. New development starts from a site and tests tenant demand and zoning for a new building.

How does Build work on office projects?

Build is a vertically integrated development firm. It analyzes market demand, screens sites or buildings, assesses repositioning feasibility and prepares the investment committee memo on our own technology stack, with experts reviewing the work.

## Related links

[### Markets: Office /markets/office](https://build.inc/markets/office)[### Services /services](https://build.inc/services)[### Site selection service /services/site-selection](https://build.inc/services/site-selection)

## Related terms

[### CRE Market Research CRE market research is the systematic analysis of commercial real estate market conditions – supply and demand dynamics, demographic trends, economic indicators, comparable transactions, and competitive landscape – used to inform investment, development, and leasing decisions. AI has transformed CRE market research from a time-intensive manual process into an on-demand capability that can synthesize thousands of data points in hours.](https://build.inc/learn/cre-market-research)[### Test Fit Analysis Test fit analysis is the process of determining whether and how a proposed building program can physically fit on a development site within zoning and regulatory constraints. It includes massing studies, floor plate layouts, parking configurations, unit mix optimization, and preliminary site planning. AI tools can now generate and evaluate multiple test fit scenarios rapidly, accelerating early-stage development feasibility.](https://build.inc/learn/test-fit-analysis)[### Investment Committee Memo An investment committee memo (IC memo) is the formal document presented to a real estate investment firm's decision-making body to recommend or evaluate a potential transaction. It synthesizes market research, financial analysis, risk assessment, comparable transactions, and deal terms into a structured narrative that enables informed investment decisions. AI can now draft IC memos by pulling together outputs from upstream analysis workflows.](https://build.inc/learn/investment-committee-memo)