# Data Center Site Selection RFP: Questions to Ask

A data center site selection RFP should ask how providers prove power, not only how they find land. Here are 18 questions, a scoring rubric and the red flags that should end the conversation.

by Build Team • November 20, 2026 • 6 min read

**Short answer:** A data center site selection RFP should ask providers how they prove power, not only how they find land. The questions that separate strong providers are about evidence: what sources they read, how they score deliverable capacity, how often they refresh findings, who verifies the output, and what you receive at the end. Ask for a sample site file with sources. This guide lists the questions to put in an RFP for AI site selection or site selection services, grouped by topic. It follows the Build order for [data center site selection](https://build.inc/learn/ai-site-selection/data-centers): sites, then validation, then bundled services.

## What should the RFP include before the questions?

Your requirements. Providers can only answer well if you state target megawatts, energization date, markets, density, cooling preference, water limits and exclusions. Our guide to [writing a site requirements brief](https://build.inc/insights/data-center-site-requirements-brief) covers the format.

## Which questions should you ask?

### Power

1.  How do you separate available capacity from deliverable capacity, and what evidence level do you require before calling a site viable? See [available vs deliverable capacity](https://build.inc/insights/available-vs-deliverable-data-center-capacity).

2.  Which utility and grid operator documents do you read, and can you cite them per site?

3.  How do you treat queue position? The IEA notes queues contain duplicative or speculative projects ([IEA](https://www.iea.org/reports/powering-artificial-intelligence/executive-summary)).

4.  How do you track new large load rules? In PJM, for example, loads of 50 MW or more at one site are now defined as Large Loads ([PJM filing](https://www.pjm.com/-/media/DotCom/documents/ferc/filings/2026/20261116-er27-522-000.pdf)).

5.  Will you contact the utility, and at what stage?

### Zoning and permitting

1.  How do you confirm whether the use is by-right or needs a special use permit? See [by-right zoning vs special use permits](https://build.inc/insights/data-center-by-right-zoning-vs-special-use-permit).

2.  How do you monitor moratoriums and pending ordinance changes?

3.  Do you screen wetlands, floodplain and airspace before shortlisting?

### Water, fiber and land

1.  How do you assess water availability for the cooling method we plan?

2.  How do you confirm diverse fiber routes and lateral cost?

3.  How do you check title, easements and mineral rights at the shortlist stage?

### Method and verification

1.  Which steps are automated and which are reviewed by a named expert?

2.  How often do you refresh findings, and how do you flag what changed?

3.  What is your error-handling process when a source conflicts with another?

4.  Can we see a sample site file with every claim sourced?

### Deliverables and handoff

1.  What exactly do we receive: ranked list, site files, test fits, a decision memo?

2.  Can you carry a passing site into design, permitting and preconstruction, or does work restart with a new team?

3.  What happens if a shortlisted site fails validation?

## How should you score the answers?

Criterion

Strong answer

Weak answer

Power evidence

Evidence levels with sources per site

Distance to substation only

Verification

Named expert review of deciding facts

Model output without review

Freshness

Scheduled re-checks with change flags

One-time report

Permitting

Zoning path and moratorium watch per site

Zoning district label only

Handoff

One record carried into bundled services

Report ends at shortlist

This rubric is Build's framing. For a fuller tool rubric, see our [AI site selection tools scorecard](https://build.inc/insights/how-to-evaluate-ai-site-selection-tools-scorecard), and for vendor categories see [data center site selection software](https://build.inc/insights/data-center-site-selection-software-buyers-guide) and [AI data center site selection companies compared](https://build.inc/insights/ai-data-center-site-selection-companies-compared).

## Which red flags should end the conversation?

-   No sources behind power claims.

-   Capacity quoted without a date.

-   No answer on how often findings are refreshed.

-   No expert named for verification.

-   A deliverable that stops at a map.

## What does Build do?

Build is the development execution engine for infrastructure and data centers, built for quality and speed. We answer these questions with a sourced site file: sites first, then validation of power, zoning, water and fiber, then bundled services that carry a passing site into design and permitting. That is [AI native development](https://build.inc/learn/ai-native-development). See [Build's site selection services](https://build.inc/services/site-selection).

## Key takeaways

-   Put your requirements in the RFP so providers can answer against them.

-   Ask how providers prove deliverable power, verify output and refresh findings.

-   Request a sample site file with sources, and score answers on evidence, not volume.

## Sources

-   [IEA: Powering Artificial Intelligence, executive summary](https://www.iea.org/reports/powering-artificial-intelligence/executive-summary)

-   [PJM: Large Computational Load filing to FERC (16 Nov 2026)](https://www.pjm.com/-/media/DotCom/documents/ferc/filings/2026/20261116-er27-522-000.pdf)

## Frequently Asked Questions:

What should a data center site selection RFP ask?

How the provider proves deliverable power, which sources it reads, how it handles zoning and permitting, who verifies the output, how often findings are refreshed and what you receive.

What should I include in the RFP itself?

Target megawatts, energization date, markets, density, cooling preference, water limits and exclusions, ideally as a written site requirements brief.

How do I compare AI site selection providers?

Score answers on power evidence, expert verification, freshness of data, permitting depth and whether work carries into later services.

What is the biggest red flag?

Power claims without sources or dates, such as quoting capacity based only on distance to a substation.

Should I ask for a sample deliverable?

Yes. A sample site file with every claim sourced shows the provider's method better than any description.

Does Build respond to site selection RFPs?

Build delivers site selection as a service: sourced site files, validation and the bundled services that follow.

[Workflows ### How AI Site Selection Validates Data Center Power November 20, 2026](https://build.inc/insights/how-ai-site-selection-validates-data-center-power)[Workflows ### The AI Native Development Process, Step by Step November 20, 2026](https://build.inc/insights/ai-native-development-process-step-by-step)[Workflows ### GIS vs AI Site Selection for Data Centers November 19, 2026](https://build.inc/insights/gis-vs-ai-site-selection-data-centers)