---
title: "Data Center Sale-Leasebacks: What Developers Should Know | Insights | Build"
description: "A data center sale-leaseback is a deal where the owner sells a completed facility and leases it back long term. On 16 November 2026, Blackstone Digital Infrastructure Trust agreed to buy 75% of two AWS campuses, 13 powered shells and 647 MW, for about $5 billion, with a 12-year initial leaseback. For developers, the lesson is that buyers are paying for a long lease with a strong tenant on a finished shell."
url: https://build.inc/insights/data-center-sale-leasebacks-developers
---

[Industry](https://build.inc/insights?category=industry)

# Data Center Sale-Leasebacks: What Developers Should Know

A data center sale-leaseback is a deal where the owner sells a completed facility and leases it back long term. On 16 November 2026, Blackstone Digital Infrastructure Trust agreed to buy 75% of two AWS campuses, 13 powered shells and 647 MW, for about $5 billion, with a 12-year initial leaseback. For developers, the lesson is that buyers are paying for a long lease with a strong tenant on a finished shell.

by Build Team • November 18, 2026 • 6 min read

**Short answer:** A data center sale-leaseback is a transaction where the owner sells a completed facility and immediately leases it back from the buyer on a long-term lease. On 16 November 2026, Blackstone Digital Infrastructure Trust (NYSE: BXDC) announced a definitive agreement to buy a 75% majority interest in two joint ventures with Amazon Web Services. The joint ventures own 13 newly constructed powered shells totaling 647 MW, in a transaction valued at about $5 billion. AWS leases back 100% of the portfolio. For developers, the takeaway is that institutional buyers pay for long, triple-net leases to investment-grade tenants on finished shells, which makes delivery quality and power certainty the foundation of an exit. See [data center development](https://build.inc/learn/ai-pre-construction/data-centers) for how Build approaches it, and [AI native development](https://build.inc/learn/ai-native-development) for the method.

## What did Blackstone agree to buy?

The figures below come from Blackstone's press release and its Form 8-K filed with the SEC.

Term

Disclosed detail

Buyer

Blackstone Digital Infrastructure Trust Inc. (BXDC), its first investment

Seller and tenant

Affiliates of Amazon Data Services, Inc.

Assets

13 newly constructed powered shells on two campuses: nine buildings in northern Indiana and four in Mississippi

Capacity

647 MW of aggregate IT power capacity

Interest acquired

75.1% controlling interest in each joint venture (Blackstone's release rounds this to 75%). AWS keeps 24.9%

Aggregate gross value

$5.0 billion, at a 7.0% initial capitalization rate

Lease

100% leased to the tenant, triple net, guaranteed by Amazon.com, Inc. Weighted average initial term of 12 years, fully extended term of 32 years, 2.75% annual rent escalator

Funding

About $1.9 billion of BXDC's IPO proceeds plus about $2.5 billion of new non-recourse mortgage loans secured by the properties

Timing

Expected to close in the fourth quarter of 2026, subject to closing conditions

The 8-K says the contribution agreement was signed on 11 November 2026, and the transaction "may not be completed on \[its\] contemplated terms, or at all."

A simple calculation on the disclosed figures: a 7.0% initial cap rate on $5.0 billion implies about $350 million of first-year base rent. Divided across 647 MW, gross value is roughly $7.7 million per MW. These are Build's arithmetic, not figures the parties published.

## What is a sale-leaseback in a data center deal?

In a sale-leaseback, the owner sells the asset and signs a lease to keep using it. The seller gets capital back. The buyer gets an income stream backed by the lease. In this deal, the seller is also the hyperscale tenant, which contributes the properties to joint ventures and keeps a 24.9% stake. That differs from the more common developer sale, but the logic the buyer applies to the asset is the same.

## What do buyers appear to pay for?

From the disclosed terms, the value sits in four places:

1.  **A long lease.** A 12-year weighted initial term with extensions to 32 years.

2.  **Triple-net structure.** The tenant carries operating costs, so rent is closer to income.

3.  **Tenant credit.** The 8-K says the tenant's payment obligations are guaranteed by the parent. Blackstone's transaction summary shows an S&P rating of AA for the tenant.

4.  **A finished, powered shell.** All 13 buildings are newly constructed, so the buyer is not taking development or energization risk.

This is Build's reading of the disclosed terms, not a statement from Blackstone about its underwriting.

## What does this mean for developers?

-   **Exit value starts at site selection.** A powered shell is only worth a stabilized multiple if power arrives on schedule. Validating power deliverability, zoning, fiber, water and land before site control is what protects the delivery date the lease depends on. See [powered shell data centers](https://build.inc/insights/powered-shell-data-centers) and [powered land validation](https://build.inc/insights/powered-land-validation-what-it-proves).

-   **Institutional capital wants stabilized income.** BXDC says it targets newly constructed, stabilized data centers leased to investment-grade hyperscale tenants on long-term contracts. Developers who deliver to that profile have a clearer path to a buyer. See [Blackstone and the institutional capital signal](https://build.inc/insights/blackstone-ai-data-center-institutional-capital-signal) and [data center investment funds](https://build.inc/insights/data-center-investment-funds).

-   **Construction quality and speed are part of the exit.** A late or defective shell changes what a tenant and a buyer will accept. See [data center construction costs](https://build.inc/insights/data-center-construction-costs-2025).

-   **Concentration cuts both ways.** One tenant and one lease per campus means the credit and lease terms drive the analysis, as they do in any [build-to-suit](https://build.inc/insights/what-is-build-to-suit-data-center) structure.

Build is the development execution engine for infrastructure. It sources sites, validates them against primary sources, then bundles the services that take a site from shortlist toward delivery, with quality and speed as the standard.

## What should you check before planning a sale-leaseback exit?

-   Is the power path documented and tied to an energization date the tenant will accept?

-   Does the lease allocate the cost of delays and changes clearly?

-   Is the tenant's credit, or a parent guarantee, strong enough for the buyer's lenders?

-   Can the asset be re-tenanted if the lease ends?

-   Do you have the title, entitlement and environmental file a buyer will ask for? See [the data center land due diligence checklist](https://build.inc/insights/data-center-land-due-diligence-checklist).

## Key takeaways

-   On 16 November 2026, BXDC announced a roughly $5 billion deal for 75% of two AWS campuses: 13 powered shells, 647 MW, with a 12-year initial leaseback.

-   Disclosed terms: 7.0% initial cap rate, triple net, 2.75% annual escalator, 32-year fully extended term. Closing is expected in Q4 2026 and is not guaranteed.

-   Buyers appear to be paying for lease length, tenant credit and a finished powered shell.

-   For developers, exit value depends on power certainty and delivery quality, which are decided at site selection.

## Sources

-   [Blackstone press release: BXDC announces $5 billion acquisition of stabilized data center portfolio](https://www.blackstone.com/news/press/blackstone-digital-infrastructure-trust-announces-5-billion-acquisition-of-stabilized-data-center-portfolio/), 16 November 2026

-   [BXDC Form 8-K, SEC EDGAR](https://www.sec.gov/Archives/edgar/data/2100161/000119312526461954/d115778d8k.htm)

-   [BXDC transaction summary, SEC EDGAR](https://www.sec.gov/Archives/edgar/data/2100161/000210016126000015/bxdc-transactionsummary.htm)

## Frequently Asked Questions:

What is a data center sale-leaseback?

A sale-leaseback is a transaction where the owner of a completed data center sells it and signs a long-term lease to keep using it. The seller recovers capital and the buyer gets lease-backed income.

What did Blackstone agree to buy from AWS?

BXDC agreed to acquire a 75.1% controlling interest in two joint ventures that own 13 newly constructed powered shells totaling 647 MW on two AWS campuses, in Indiana and Mississippi, at an aggregate gross value of $5.0 billion. AWS keeps 24.9%.

What are the lease terms in the BXDC and AWS deal?

Triple net, 100% leased to the tenant, with a weighted average initial term of 12 years, a weighted average fully extended term of 32 years and a 2.75% annual rent escalator. The initial cap rate is 7.0%.

Has the BXDC and AWS deal closed?

No. It is expected to close in the fourth quarter of 2026 and is subject to closing conditions. The 8-K notes it may not be completed on its contemplated terms, or at all.

Is this a typical developer sale-leaseback?

Not exactly. The seller in this deal is the hyperscale tenant itself, which contributes its newly built properties to joint ventures and keeps a 24.9% stake. The buyer logic of long lease, tenant credit and finished shell still applies to developers.

What does a powered shell mean?

A powered shell is a building with structure and power delivered, where the tenant installs its own cooling and IT fit-out. Blackstone's release describes all 13 buildings in this deal as newly constructed powered shells.

[Industry ### Data Center Grid Contracts: What 10 to 20 Years Means November 19, 2026](https://build.inc/insights/data-center-grid-contracts-10-to-20-years)[Industry ### Nvidia's Neocloud Guarantees: What Sites Now Need November 19, 2026](https://build.inc/insights/nvidia-neocloud-guarantees-what-sites-need)[Industry ### PJM Fast Energization: What Changes for Data Centers November 18, 2026](https://build.inc/insights/pjm-fast-energization-data-centers)
