---
title: "Insights — AI, CRE & the Built World | Build"
description: "Research, analysis, and perspectives on agentic AI, commercial real estate development, data centers, and the future of the built world from Build."
url: https://build.inc/insights?page=14
---

# Insights

Research, analysis, and perspectives on the built world.

[All](https://build.inc/insights) [Asset Classes](https://build.inc/insights?category=asset-classes)[Workflows](https://build.inc/insights?category=workflows)[Markets](https://build.inc/insights?category=markets)[Technology](https://build.inc/insights?category=technology)[Industry](https://build.inc/insights?category=industry)

[Asset Classes ### Speculative Data Center Development: How to Underwrite Without a Signed Lease Speculative data center development has become a defining feature of the AI infrastructure cycle, with developers breaking ground on powered shells before hyperscale tenants sign. This piece covers why the spec build model is rational given grid constraints, how capital is structured without pre-leasing, and the three failure modes that break the model. June 12, 2026 ·5 min read](https://build.inc/insights/speculative-data-center-development-underwriting)[Workflows ### AI-Assisted Data Center Site Acquisition: The Pre-LOI Workflow Data center site acquisition has changed structurally: developers who win are completing substantive power and regulatory screening before signing LOIs. This post breaks down the five-step pre-LOI workflow, from geospatial power screening to LOI structure, and explains what AI can automate versus what requires human judgment. June 12, 2026 ·5 min read](https://build.inc/insights/ai-data-center-site-acquisition-pre-loi-workflow)[Asset Classes ### Data Center Brownfield Redevelopment: Why Infill Sites Are Back in Play Brownfield and infill sites are back in the hunt because power, permitting and community alignment matter more than raw acreage. The winning sites already have industrial history, utility access and enough room for phased expansion. June 10, 2026 ·5 min read](https://build.inc/insights/data-center-brownfield-redevelopment)[Technology ### Zero-Water Cooling for Data Centers: What Is Ready Now Microsoft’s zero-water cooling design shows where the market is headed, with lower water use and new siting options. The real question is where the technology is ready today and where it remains early. June 10, 2026 ·4 min read](https://build.inc/insights/zero-water-cooling-data-centers)[Workflows ### How to Review a Large Load Tariff for a Data Center Deal Large load tariffs are now a core diligence item for data center developers because they determine rate class, cost allocation, collateral and exit risk. This guide shows the review order, what AI can monitor and where humans still need to sign off. June 10, 2026 ·4 min read](https://build.inc/insights/large-load-tariff-review-data-center-deal)[Asset Classes ### Data Center Water Strategy in 2026: What Developers Need to Model Before Site Control Water strategy is now a site control issue for data center developers. This piece explains how cooling choice, water rights, drought exposure and permitting interact before a site is under contract. June 10, 2026 ·4 min read](https://build.inc/insights/data-center-water-strategy-2026)[Workflows ### Data Center Entitlement Risk in 2026: How AI Moves Permitting Up Front Entitlement risk has moved to the front of data center diligence. This post shows how AI compresses zoning, moratorium and permit review before a developer commits to a site. June 10, 2026 ·4 min read](https://build.inc/insights/data-center-entitlement-risk-2026)[Technology ### What Is PropTech? A Practical Definition for Real Estate Development Teams PropTech is not every software tool in real estate. This guide defines the category for development teams, shows where AI agents fit and explains why data governance now matters more than buzzwords. June 7, 2026 ·5 min read](https://build.inc/insights/what-is-proptech-real-estate-development)[Workflows ### What Is a Data Center Load Study? A Developer's Guide A data center load study is the first power test a project must pass. This guide explains what developers submit, what utilities return and why the study now sits ahead of site control. June 7, 2026 ·5 min read](https://build.inc/insights/what-is-a-data-center-load-study)
