---
title: "Insights — AI, CRE & the Built World | Build"
description: "Research, analysis, and perspectives on agentic AI, commercial real estate development, data centers, and the future of the built world from Build."
url: https://build.inc/insights?category=technology
---

# Insights

Research, analysis, and perspectives on the built world.

[All](https://build.inc/insights) [Asset Classes](https://build.inc/insights?category=asset-classes)[Workflows](https://build.inc/insights?category=workflows)[Markets](https://build.inc/insights?category=markets)[Technology](https://build.inc/insights?category=technology)[Industry](https://build.inc/insights?category=industry)

[Technology ### What Is MEP Design for an AI Data Center? MEP design for an AI data center is the coordinated mechanical, electrical and plumbing design that turns a stated critical IT load into systems a utility, a tenant and a contractor can rely on. This explainer covers what each discipline includes, why AI campuses change the order of work, what a complete package contains and how Build runs it as part of one development program. November 25, 2026 ·5 min read](https://build.inc/insights/what-is-mep-design-ai-data-center)[Technology ### Critical IT Load vs Utility Load: What's the Difference? Critical IT load is the power available to computing equipment. Utility load is what the whole data center draws, including cooling, conversion losses and building systems. Leases are usually written on the first number; interconnection requests and large-load rules use the second. This guide explains the difference, how PUE connects the two, and how to use both numbers in site selection. November 25, 2026 ·5 min read](https://build.inc/insights/critical-it-load-vs-utility-load)[Technology ### How to Size Transformers for an AI Data Center Size a data center transformer from the design load: convert MW to MVA using power factor, apply the redundancy design, add growth, and confirm the rating with the utility and the engineer of record. Wood Mackenzie reported 162-week transformer waitlists in October 2026, so order only against a frozen design. November 23, 2026 ·5 min read](https://build.inc/insights/how-to-size-transformers-ai-data-center)[Technology ### Data Center Due Diligence: Technology vs Services Technology finds and organizes data center diligence facts fast; services confirm them and stand behind the answer. Here is what is specific to data centers and when to use each. November 20, 2026 ·6 min read](https://build.inc/insights/data-center-due-diligence-technology-vs-services)[Technology ### Data Center Generator Load Bank Testing, Explained Load bank testing runs a generator against a simulated electrical load to prove it can carry real demand. This explainer covers what NFPA 110 requires, when a supplemental test applies, and how to size a load bank, with illustrative arithmetic. November 19, 2026 ·6 min read](https://build.inc/insights/data-center-generator-load-bank-testing-explained)[Technology ### CRE Due Diligence Platform vs Software vs Services CRE due diligence software is a tool your team operates. A platform is a shared system that runs the workflow across deals. Services are people who do the diligence and stand behind the result. The right choice depends on who must be accountable for the answer and how many deals you run. November 18, 2026 ·6 min read](https://build.inc/insights/cre-due-diligence-platform-vs-software-vs-services)[Technology ### Data Center Generator Fuel Storage: How Many Hours? The Uptime Institute Tier Standard sets a minimum of 12 hours of on-site fuel at N load, for every Tier. Many large facilities specify 48 to 96 hours. At about 79 gallons per hour for each megawatt on the generators, 48 hours needs roughly 3,800 usable gallons per megawatt. November 18, 2026 ·6 min read](https://build.inc/insights/data-center-generator-fuel-storage-hours)[Technology ### Wildfire Power Shutoff (PSPS) Exposure for Data Center Sites: How to Screen It Public Safety Power Shutoffs let utilities de-energize lines during high wildfire risk. Data center PSPS exposure follows the serving circuit, not just the parcel, so screen feeds against fire risk maps, shutoff history, and backup fuel autonomy. November 10, 2026 ·6 min read](https://build.inc/insights/data-center-wildfire-power-shutoff-psps-exposure)[Technology ### Interconnection Voltage for Data Centers: What 69 kV, 138 kV, and 230 kV Mean for a Site Interconnection voltage is the voltage at which a data center connects to the utility grid. Lower voltage connects faster and costs less but caps how many megawatts a site can ever draw. Higher voltage supports larger campuses but usually means a customer-owned substation and a longer study and equipment timeline. Size the voltage to full buildout, not phase one, and confirm the exact line and substation, not just the voltage class. November 6, 2026 ·6 min read](https://build.inc/insights/data-center-interconnection-voltage-level-site-selection)
