---
title: "Insights — AI, CRE & the Built World | Build"
description: "Research, analysis, and perspectives on agentic AI, commercial real estate development, data centers, and the future of the built world from Build."
url: https://build.inc/insights?category=industry
---

# Insights

Research, analysis, and perspectives on the built world.

[All](https://build.inc/insights) [Asset Classes](https://build.inc/insights?category=asset-classes)[Workflows](https://build.inc/insights?category=workflows)[Markets](https://build.inc/insights?category=markets)[Technology](https://build.inc/insights?category=technology)[Industry](https://build.inc/insights?category=industry)

[Industry ### Can a State Override a Local Data Center Vote? Sometimes. Local governments usually control zoning for a data center building, but a state agency may permit the power plant or transmission that serves it. In November 2026 the Ohio Power Siting Board approved an up-to-800 MW behind-the-meter gas plant for a planned data center about two weeks after 81% of Ashville voters rejected the local agreement. This explainer covers what happened, why the state could decide, and how developers should map entitlement risk by agency. November 26, 2026 ·5 min read](https://build.inc/insights/can-state-override-local-data-center-vote)[Industry ### What Is Contribution in Aid of Construction (CIAC)? Contribution in aid of construction (CIAC) is money a customer pays a utility to cover facilities the utility builds and owns to serve that customer. It is one of the main ways large loads such as data centers pay for the grid buildout they trigger. This explainer covers how CIAC works, Cheyenne Light's November 2026 FERC filing of three Microsoft agreements funded through CIAC, and what developers should check in a CIAC agreement. November 26, 2026 ·5 min read](https://build.inc/insights/what-is-contribution-in-aid-of-construction-ciac)[Industry ### What Is ERCOT Batch Zero? The Dec 10 Audit Explained Batch Zero is ERCOT's one-time study of large loads of 75 MW or more under PGRR 145. ERCOT has paused energization of new data centers and crypto facilities at that size until it files eligibility and community-impact reports with the PUCT on 10 December 2026. This explainer covers what Batch Zero is, what ERCOT is checking and what developers should do before those reports land. November 25, 2026 ·6 min read](https://build.inc/insights/what-is-ercot-batch-zero-dec-10-audit)[Industry ### What Is Non-Firm Transmission Service for Data Centers? Non-firm transmission service is grid service that can be curtailed, which may let a data center energize before all upgrades for firm service are built. In November 2026, MISO, ISO-NE, NYISO and SPP proposed price-based non-firm options for large loads at FERC, with curtailment triggers from $25/MWh to $250/MWh. This guide explains the difference, the proposals and what developers should underwrite before FERC acts. November 25, 2026 ·6 min read](https://build.inc/insights/what-is-non-firm-transmission-service-data-centers)[Industry ### Spain's Data Center Decree: What Developers Must Prove Spain's Royal Decree 1032/2026 requires data centers of 10 MW or more to match at least 80% of each hour's power use with renewables generated that hour, mostly from new plants, and to meet WUE 0.1 and PUE 1.25 caps. An optional five-year phase-in allows 60% then 70% in peak hours in exchange for priority disconnection. November 24, 2026 ·8 min read](https://build.inc/insights/spain-data-center-decree-what-developers-must-prove)[Industry ### Six Grid Operators' Large-Load Plans: What Changes Six U.S. grid operators filed large-load reforms at FERC between 13 and 20 November 2026. POWER reports they generally use a 50 MW threshold, but they differ on non-firm service, bring-your-own-capacity rules and upgrade costs. This guide compares the plans, the curtailment prices and the requested effective dates. November 24, 2026 ·7 min read](https://build.inc/insights/six-grid-operators-large-load-plans-ferc)[Industry ### What Is Hourly Matching for Data Center Power? Hourly matching means covering a data center's power use in every hour with clean power generated in that same hour, not just over a year. Spain now requires 80% hourly matching for data centers of 10 MW or more, and EU and U.S. hydrogen rules move to hourly matching in 2030. Here is how it works and why it changes site selection. November 24, 2026 ·6 min read](https://build.inc/insights/what-is-hourly-matching-data-center-power)[Industry ### What Is a Large Load? The Emerging 50 MW Threshold Explained There is no single national definition of a large load. Six grid operators filed reforms at FERC in November 2026 that appear to accept a 50 MW threshold, while TVA uses above 5 MW, the DOE proposal pointed to above 20 MW and Georgia Power's rule starts above 100 MW. The filings are proposals, and the service offered after the threshold differs by region. November 23, 2026 ·5 min read](https://build.inc/insights/what-is-a-large-load)[Industry ### What Is an Interconnection Readiness Deposit? An interconnection readiness deposit is at-risk money that shows a project is ready before a grid operator studies it. PJM's 16 November 2026 Fast Energization filing proposes stricter readiness requirements applied earlier, with deposits posted at application and a cost recovery agreement required for large loads. It is a proposal, not a rule. November 23, 2026 ·5 min read](https://build.inc/insights/interconnection-readiness-deposit-explained)
