---
title: "Insights — AI, CRE & the Built World | Build"
description: "Research, analysis, and perspectives on agentic AI, commercial real estate development, data centers, and the future of the built world from Build."
url: https://build.inc/insights?category=asset-classes
---

# Insights

Research, analysis, and perspectives on the built world.

[All](https://build.inc/insights) [Asset Classes](https://build.inc/insights?category=asset-classes)[Workflows](https://build.inc/insights?category=workflows)[Markets](https://build.inc/insights?category=markets)[Technology](https://build.inc/insights?category=technology)[Industry](https://build.inc/insights?category=industry)

[Asset Classes ### What Is a Build-to-Suit Data Center? A build-to-suit data center is a facility designed and built to one named tenant's specifications, usually under a long-term lease signed before or early in construction. The tenant gets a facility matched to its needs. The developer carries construction and delivery risk but has largely retired demand risk. November 18, 2026 ·6 min read](https://build.inc/insights/what-is-build-to-suit-data-center)[Asset Classes ### How Much Land Does a Data Center Campus Need? A Sizing Method, Not a Rule of Thumb There is no single acres-per-megawatt number for data centers. Land need depends on IT load, rack density, building height, substation, generator and cooling yards, setbacks, and stormwater rules. This guide defines net developable acreage, lists what takes up land on a campus, and gives a seven-step sizing method with an illustrative worked example and decision rules. November 5, 2026 ·5 min read](https://build.inc/insights/how-much-land-does-a-data-center-campus-need)[Asset Classes ### Fiber Laterals for Data Center Sites: Cost Drivers, Timelines, and Decision Rules A fiber lateral connects an existing fiber route into a data center site. Distance to a usable splice point, construction method, crossings, easements, and the need for diverse paths drive its cost and timeline. Validate lateral options with providers before LOI and time them to power delivery. November 3, 2026 ·5 min read](https://build.inc/insights/data-center-fiber-lateral-cost-timeline)[Asset Classes ### How to Rank a Data Center Site Shortlist Rank a data center site shortlist by removing sites that fail gating tests, scoring the rest on weighted criteria led by deliverable power, and applying tie-break rules. This guide includes an example scoring table, what evidence each rank needs, and common ranking mistakes. November 2, 2026 ·5 min read](https://build.inc/insights/how-to-rank-data-center-site-shortlist)[Asset Classes ### Retired Coal Plant Data Centers: Site Criteria for Brownfield Power Campuses Retired coal plant data centers are becoming a serious siting strategy because they may offer land, transmission infrastructure and industrial zoning in one package. This post breaks down the site criteria developers need to underwrite, including switchyard reuse, environmental remediation, water, gas, demolition and community acceptance. September 25, 2026 ·5 min read](https://build.inc/insights/retired-coal-plant-data-centers)[Asset Classes ### Data Center Fire Suppression Systems: What to Specify Early Data center fire suppression is a room-level design choice that affects code, insurance, downtime and handover. This piece breaks down what NFPA 75 and FM Global actually require and where clean agent, pre-action and hybrid systems fit. June 28, 2026 ·4 min read](https://build.inc/insights/data-center-fire-suppression-systems)[Asset Classes ### Dry Utilities for Data Centers: What Developers Need to Prepare Before Construction Starts A practitioner guide to dry utility coordination for data center development. Covers electrical service coordination (load studies, utility service agreements, transformer placement), fiber and telecom redundancy, duct bank and handhole design, and the six most common developer oversights that cause schedule slippage and cost overruns. June 27, 2026 ·5 min read](https://build.inc/insights/data-center-dry-utilities-site-preparation)[Asset Classes ### Generator Sizing for AI Data Centers: What the New Math Looks Like AI-era data centers require fundamentally different generator fleet sizing -- Amazon runs 93 generators at 2.5MW each for a single site. This post explains the current methodology: how to calculate fleet size, why transient AI loads matter, fuel logistics at scale, and the regulatory constraints (Illinois Tier 4, Virginia NOx) shaping procurement decisions in 2026. June 26, 2026 ·5 min read](https://build.inc/insights/generator-sizing-ai-data-centers)[Asset Classes ### Nuclear-Adjacent Data Center Sites: A Developer's Guide to Power-Certain Site Selection Nuclear adjacency has moved from a secondary consideration to an explicit site screening criterion for data center developers in 2026. This post covers the five dimensions of nuclear-adjacent evaluation, the FERC colocation framework, and AI's role in screening -- alongside what still requires direct relationships and engineering judgment. June 24, 2026 ·5 min read](https://build.inc/insights/nuclear-adjacent-data-center-site-selection)
