---
title: "Build | Atlas: All of the Built World’s Data in one service"
description: "Build curates the built world's data into one place: 9,950+ sources on power, water, land, planning, hazards and more across 43 countries."
url: https://build.inc/atlas
---

# All of the Built World’s Data in One Service.

Build curates the built world’s data into one place, so teams get the most reliable, comprehensive and cited answers to any question.

[Partner with Build](https://build.inc/explore-partnership)

Globe with the countries Build covers outlined in green and a dot for each dataset, coloured by category

9,950+ sources across 43 countries

-   Australia
-   Austria
-   Belgium
-   Brazil
-   Bulgaria
-   Canada
-   Chile
-   Czechia
-   Denmark
-   Estonia
-   Finland
-   France
-   Germany
-   Greece
-   Hungary
-   Iceland
-   India
-   Indonesia
-   Ireland
-   Italy
-   Japan
-   Kazakhstan
-   Latvia
-   Lithuania
-   Malaysia
-   Mexico
-   Netherlands
-   Norway
-   Peru
-   Poland
-   Portugal
-   Rwanda
-   Saudi Arabia
-   Serbia
-   Singapore
-   Slovakia
-   Spain
-   Sweden
-   Switzerland
-   Türkiye
-   United Arab Emirates
-   United Kingdom
-   United States

## The data Build covers

Search the data Build covers

### Power & Grid

-   Substations

    Substation locations, transformers, voltages, capacity heatmaps, headroom, connection queues.

-   Transmission

    HV/EHV overhead lines, underground cables, masts, line ratings, planned transmission corridors.

-   Distribution

    MV/LV distribution lines, distribution poles, secondary substations, feeder capacity.

-   Generation

    Conventional / thermal power plants (coal, gas, nuclear, biomass, oil).

-   Renewables

    Wind farms / turbines, solar parks, hydropower, geothermal, wave / tidal.

-   Gas & Heat Networks

    LP gas distribution, district heating, waste heat networks. (Excludes HP transmission pipelines.)

-   Electric Service Territories

    Utility service-area boundaries: who serves where.

### Water

-   Water Supply

    Public water utilities, mains, drinking water service areas.

-   Site Water Discharge

    Sewer mains, treatment plants, outfalls, CSOs, stormwater drainage.

-   Groundwater

    Aquifers, wells, water table, hydrogeology.

-   Surface Water

    Rivers, lakes, watersheds, hydrography, flowlines.

-   Water Use Restrictions

    Drinking water protection zones, impaired waters, sensitive areas.

### Network Infrastructure

-   Fibre & Cables

    Physical fibre routes, dark fibre, subsea cable landings.

-   Internet Service Coverage

    Consumer broadband coverage by area (any medium).

-   Internet Exchange Points

    IXPs and peering hubs.

-   Data Centres

    Existing DC inventory.

-   Telecom & Radio Infrastructure

    Cell towers, masts, microwave clearance zones, radio beams.

### Transport & Access

-   Road Network

    All roads, AADT / traffic data, crashes, bridges, freight terminals, truck routes, intermodal, bikeways / trails.

-   Rail

    Railway lines (freight + passenger), stations, light rail / tram / metro.

-   Aviation

    Airports, runways, heliports, aviation safeguarding zones.

-   Ports & Waterways

    Seaports, navigable waterways, container terminals, navigation locks.

-   Public Transit

    Bus stops, transit routes, TOD infrastructure, park & ride.

### Land & Ownership

-   Cadastral Parcels

    Parcel / lot boundaries with parcel IDs.

-   Tax & Assessment

    Tax parcels, assessed values, mill rates, special taxing districts.

-   Public Lands

    Federal / Crown / state / public-agency-owned lands.

-   Easements & Rights-of-Way

    Easements, ROW corridors, pipeline easements, utility easements.

-   Subsurface Rights & Leases

    Mineral claims, oil / gas leases, mining permits, subsurface rights.

-   Indigenous & Tribal Lands

    Aboriginal lands, First Nations reserves, tribal lands, reservation boundaries.

### Planning & Zoning

-   Zoning Districts

    Current binding zoning codes, district maps, dimensional standards.

-   Land Use Plans

    Comprehensive plans, master plans, regional / strategic plans, future land use maps.

-   Planning Applications

    Submitted / approved applications, large-permit registers.

-   Development Designations

    TIF, opportunity zones, enterprise zones, brownfield areas, TOD, redevelopment, FTZs.

-   Overlays & Special Districts

    Overlay districts, special purpose districts, aviation / heritage / viewshed overlays.

-   Environmental Assessments

    EIA registers, environmental review project areas.

-   Building Codes & Design

    Local building codes, design codes, dimensional design standards.

### Geotechnical

-   Bedrock Geology

    Bedrock formation maps, lithology, geological ages, fault structures.

-   Surficial Geology

    Quaternary deposits, drift, glacial landforms, sediments.

-   Soil

    Soil classification, soil surveys, soil properties, soil chemistry.

-   Terrain & Elevation

    DEMs, contours, slope, topographic baselines.

-   Boreholes & Investigations

    Borehole records, geotechnical investigations, drilling data, depth-to-bedrock.

-   Ground Conditions

    Shrink-swell, acid sulfate, compressible ground, running sand, karst, radon as ground gas.

-   Subsurface Resource Maps

    Geological mineral occurrence maps, aggregate potential, raw materials, shale plays.

### Hazards

-   Contaminated Land

    Brownfields, contaminated / polluted sites, deed restrictions, contamination plumes.

-   Industrial Emissions & Facilities

    PRTR / E-PRTR / NPRI / TRI, IPPC / IED, ETS, ECHO facilities.

-   Air Pollution Zones

    Nonattainment areas, AQ management zones, AQ monitoring stations.

-   Storage Tanks

    USTs, LUSTs, aboveground petroleum tanks, bulk chemical storage.

-   Landfills & Waste

    Active and historic landfills, TSDFs, waste licensing, spoil heaps, coal ash ponds.

-   Mining & Quarries

    Active mines, quarries, mineral extraction, coal mines, mine entries, mineral processing.

-   Pipelines

    HP transmission pipelines (gas, oil, chemical, NGL, CO₂) as proximity hazards.

-   Major Hazard Sites

    Seveso / COMAH / RMP facilities, chemical and explosives plants, nuclear installations.

-   Military & UXO

    Military installations, military operations areas, FUDS, UXO risk zones.

-   Existing Noise Contours

    Strategic noise maps from roads / rail / airports / industry.

-   Radon

    Radon risk / potential maps (as health exposure).

### Natural Risks

-   Flood Risk

    River and fluvial flood zones, FEMA floodplains, regulatory floodways.

-   Coastal Hazards

    Coastal flood, storm surge, sea level rise, tsunami, coastal erosion.

-   Seismic

    Earthquake epicenters, seismic hazard zones, active faults, liquefaction.

-   Wildfire

    Wildfire risk, fire history, fire perimeters, fire danger, WUI.

-   Extreme Weather

    Tornado, hurricane, cyclone, hail, ice storm, strong wind, lightning, thunderstorm.

-   Landslide & Subsidence

    Landslides, subsidence, sinkholes, rockfall, mass movement, debris flows.

-   Climate Hazards

    Drought, heat wave, cold wave, desertification, volcanic activity, avalanche.

-   Composite Risk Indices

    Multi-hazard composite scores (FEMA NRI, OpenDRR, GEM Global).

### Protected Areas & Heritage

-   Nature Conservation Areas

    Natura 2000, SSSI, AONB, nature reserves, national parks, biosphere reserves, marine PAs.

-   Protected Species & Habitat

    Critical habitat, species at risk, biodiversity records, priority species, IBAs.

-   Wetlands & Peatlands

    NWI, Ramsar, wetland inventory, peatlands, bog / marsh / fen, tidal wetlands.

-   Agriculture & Forestry

    Agricultural land, prime farmland, forest cover, ancient / protected woodland.

-   Natural Landscape

    Land cover classifications (CORINE, NLCD, ESA WorldCover), satellite landscape baselines.

-   Archaeological & Cultural Heritage

    Archaeological sites, scheduled monuments, ancient monuments, sensitivity grids.

-   Historic Buildings & Districts

    Listed buildings, historic districts, conservation areas, World Heritage Sites, registered parks & gardens.

-   Parks & Recreation

    Public parks, recreation areas, greenspace, country parks, sports / leisure facilities.

### Community & Demographics

-   Administrative Boundaries

    Country / state / province, county, municipal, parish, electoral boundaries.

-   Demographics & Population

    Population grids, census counts, income, age, EJ percentiles, disadvantaged community designations.

-   Surrounding Buildings

    Building footprints, residential / commercial buildings, urban metrics, settlement patterns.

-   Sensitive Receptors

    Schools, hospitals, nursing homes, childcare, colleges / universities, places of worship.

-   Emergency Services

    Fire stations, police, EMS, emergency shelters, trauma centers.

-   Community Facilities & Government

    Libraries, public-sector buildings, government data, training facilities.

-   Surrounding Land Use

    Baseline land-use mix (urban / industrial / residential / agricultural), as context rather than zoning.

### Policy & Events

-   Economic Incentive Zones

    Opportunity zones, enterprise zones, tax-credit tiers, priority funding areas.

-   Permits & Approvals

    Environmental, energy, mining and construction permits.

-   Data Centers

    Existing and planned data center locations.

-   Political Sentiment

    Local political context and voting patterns.

### Climate

-   Emissions

    Industrial pollutant emissions, greenhouse gas sources, CO2 storage areas.

-   Air Quality

    Air quality management zones and monitoring stations.

-   Sea Level Rise & Projections

    Sea level rise scenarios and climate-adjusted flood elevations.

-   Heat & Drought

    Heat wave and drought frequency, drought warnings.

-   Climate Baselines

    Rainfall, wind speed, solar irradiation and temperature.

### Market

-   Land Comps

    Land sale prices, price per acre, sale dates, buyers and sellers.

-   Land Values & Assessments

    Assessed values, official land reference values, property tax.

-   Commercial Transactions

    Commercial property sales, prices, cap rates and asset types.

-   Listings & Availability

    Land and buildings for sale or lease, asking prices and sizes.

-   Rents & Vacancy

    Rents, vacancy rates and absorption by market and asset type.

-   Construction Costs

    Building cost indices by region and trade.

-   Labour Market

    Wages, employment and workforce availability by trade.

### Storage

-   Microsoft SharePoint

    Search documents, sites and shared knowledge across your SharePoint.

-   Microsoft OneDrive

    Find and work from the files your organization keeps in OneDrive.

-   Google Drive

    Find and work from the files your organization keeps in Google Drive.

-   Dropbox

    Find and work from the files in your organization’s Dropbox workspace.

-   Box

    Find and work from the files in your organization’s Box workspace.

### Communications

-   Outlook Mail

    Find emails, threads and attachments in Outlook without leaving your research.

-   Outlook Calendar

    Bring in meetings, attendees and event details from your Outlook calendars.

-   Gmail

    Find emails, threads and attachments in Gmail without leaving your research.

-   Google Calendar

    Bring in meetings, attendees and event details from your Google calendars.

-   Microsoft Teams

    Search chats, shared files and meeting context across your Teams workspace.

-   Slack

    Search messages, channels and shared files across your organization’s Slack.

### Custom

-   Your Own Data

    Upload your own datasets and layers to sit on the same map as the public catalogue.

-   Licensed Data

    Connect datasets your organization licenses, visible only to your team.

-   Documents

    Add reports, drawings and spreadsheets so answers can draw on your own files.
